All guides

Stop retyping your Excel report every week

Updated

If Friday's report starts by copying Monday's spreadsheet, you have two versions of the same work to keep up to date. A hire item comes back, an order changes or a job is delayed, and somebody has to remember to change the report as well.

A connected dashboard reads the workbook again on a schedule. That makes the report repeatable while the workbook remains the place people update the details.

Choose the workbook people actually maintain

Use the Excel file in your team's SharePoint site, not a copy downloaded to one person's laptop. Start with one worksheet whose rows have a consistent meaning: one item on hire, one order or one job.

Give each row a stable identifier. Keep dates, quantities and money in separate columns, and use the same status labels throughout. A total row under the data is useful to a reader, but it should not also be counted as another hire item. Check what the preview includes before you save.

For a hire report, a useful starting point is an item number, customer, return date, hire amount and status. Those fields let you ask what is out, what is due back and which customers have equipment on hire.

Arrange access once, then test the read

Connect the SharePoint workbook link in Brightsheet. Your Microsoft administrator approves the connector and grants it access to the required file or site. Approval for the app and access to the workbook are separate parts of the setup.

When the preview appears, check the worksheet name, headings and sample values. Tell Brightsheet which column identifies a row, which values to total and which dates drive the report. Then let the first sync finish.

Keep the first acceptance check simple. Compare the number of rows and the overall amount with Excel. Check the subtotals for two customers and a return date that could be read in either date order. Investigate a mismatch before the report becomes part of the weekly meeting.

Make the report's age visible

A scheduled report is only as current as its last successful read. Look at the sync time before acting on a recent return or change. Brightsheet lets you choose how often to check a connected sheet, including every 15 minutes. That is a schedule, not an instant update after every keystroke.

If access is removed or a read fails, check the source and sync history. Do not assume an unchanged number means nothing happened in the business.

Once the workbook and dashboard agree, use the same view at each meeting. The work becomes reviewing what changed, rather than rebuilding the report.